Kilifi, Kilifi County, Kenya

Reliable Borehole for Kilifi Girls Secondary School

Kilifi Girls Secondary School needed a more reliable water supply for students and staff. Aqua Hub Kenya delivered a complete borehole and water storage solution, helping the school improve access to clean water for daily use.

Client

Kilifi Girls Secondary School

Location

Kilifi, Kilifi County, Kenya

Duration

18 days

Completed

2026-08-26

PROJECT AT A GLANCE

What we delivered

Aqua Hub Kenya drilled a 120-metre borehole, installed a pumping system and connected it to a 10,000-litre elevated storage tank. The project was completed in 18 days and was designed to provide a dependable water supply for the school community.

120m

Drilling Depth

10,000L

Storage capacity

400+

People Served

18 days

Project Duration

The challenge

Before the project, the school experienced an unreliable water supply, particularly during periods of high demand and dry weather. Limited water availability affected daily activities such as cleaning, sanitation and general school operations.The school needed a dependable water solution that could serve its students and staff while providing sufficient storage for daily use.

Our approach

Our team began with a site assessment to understand the school’s requirements and identify a suitable location for the borehole.We then planned the drilling, pumping and storage requirements, mobilised the necessary equipment and carried out the works in stages. Throughout the project, the team worked closely with the school to minimise disruption and keep the client informed of progress.

HOW IT HAPPENED

The process, start to finish

Every Aqua Hub Kenya project follows the same stages. Here’s exactly how this one went, with photos and video from each visit.

Site survey & consultation

Site survey & consultation

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Site survey & consultation

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Site survey & consultation

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

IN PICTURES

Project gallery

THE OUTCOME

Before

The school relied on an inconsistent water supply, creating challenges for daily operations and sanitation.

After

The completed borehole and storage system provides the school with a dedicated water infrastructure solution designed around its daily requirements.

Client Testimonial

“The project has made a significant difference to our daily operations. Having a more reliable water supply means our students and staff can carry on with their activities with fewer interruptions.”
Mary Wanjiku
Head Teacher
Kilifi Girls Secondary School, Kilifi